Sign in
Successful In-Well Deepwater Installation of Largest ESP Capsules With Crossing Lines Protected Inside a Capsule
Conference proceeding

Successful In-Well Deepwater Installation of Largest ESP Capsules With Crossing Lines Protected Inside a Capsule

I Martinez, M. F Pinto, F. Liborio Neto, G Monteiro, A Lima and R Pessoa
2015 SPE Artificial Lift Conference - Latin America and Caribbean, pp.234-247
SPE Artificial Lift Conference — Latin America and Caribbean
2015

Abstract

4 Facilities Design, Construction and Operation 1.6.9 Coring, Fishing 3.1 Artificial Lift Systems 3.1.2 Electric Submersible Pumps 7 Management and Information 1.6 Drilling Operations 7.2.1 Risk, Uncertainty and Risk Assessment 3.3 Well & Reservoir Surveillance and Monitoring 7.2 Risk Management and Decision-Making 4.5.5 Installation Equipment and Techniques 3 Production and Well Operations 4.5 Offshore Facilities and Subsea Systems

Metrics

8 Record Views

Details